by admin | Feb 18, 2019 | Project Spotlight
This $950K park project was designed to provide more green space to the neighborhood and reduce air pollution, as the park abuts Route I-93. The engineering scope included drainage, utilities and stormwater management design. DCI coordinated all utility and drainage design with landscape layout and grading, ensuring a compatible design from subsurface utilities to the above-grade park features.
by admin | Jul 31, 2017 | New & Notable
DCI’s Mike Clark and Jerry Guerra attended the Massachusetts Association of Conservation Commissions’ annual Environmental Conference.
by admin | Jul 31, 2017 | Project Spotlight
DCI is assisting the Town of Harwich with the completion of a new ground-based water tank that will replace the 172-foot elevated storage tank that has projected above the tree line for more than 30 years.
by admin | Jul 5, 2017 | DCI Culture
In December 2016, DCI’s staff turned out in force for bowling, pizza and draft beer at American Flatbreads in Davis Square, Somerville. This year, the crew will head to classic Italian restaurant Bocelli’s, one of the most highly rated local restaurants in Boston.